Modern plumbing equipment has a rather complex design, so the most appropriate option will be to invite a qualified specialist. However, it will never be superfluous to know the technology by which the installation will be performed. Thus, the installation of plumbing equipment is as follows:


1. Installation of a toilet bowl traditionally begins with the installation of a frame on which this sanitary element will be fixed. It is at this stage that the height of the entire structure will be determined. The most common method of fastening - to the floor and the wall at the same time in the designated places. An important point is that the installation of the hanging toilet bowl must be done only after the completion of all the repair work in the bathroom.

2. The next stage will be the installation of a drain tank. To do this, it is necessary to bring a water pipe to the tank. Specialists choose the location of input: lateral or upper. Their choice is based on how it will be more convenient to bring the pipe to the inlet fitting. Pay attention to the service life of the tank and toilet. This is necessary in order to pick up wiring with a long service life. If the service life of flexible postings is less, then use them is prohibited.

3. Next, you need to connect the sewer. The installation of a toilet bowl implies ideal cases in which the sewage outlet connects directly to the riser. Such cases are quite rare, so this compound is most often produced by corrugation. At this stage, it is important to accurately measure the distance from the pipe cut in the wall to the surface of the facing tile. It must also be ensured that the installers wind it with adhesive tape before making the sawing of the pipes. This will prevent any possible misalignment of the cutting line. After the rough erection of the toilet bowl is completed and it is connected to the riser, it will not be superfluous to pour about three liters of water into the tank to check the integrity and tightness of the structure. Only after these events you can proceed to install the installation.


4. Finishing work. Produced by installing a waterproof gypsum plaster board with a thickness of 12.5 mm in several layers. At the same time installers use wall profiles, and also make an entire sheet of gypsum board from 3 to 5 cm. All these measures are auxiliary, since it is quite difficult to connect plasterboard with an iron frame. Between the hinged structure and the wall can be laid soundproofing material, which will make the operation of the toilet a noiseless.

5. Final stage of installation - installation of plugs and draining buttons. The latter can be of any design and configuration. Therefore, when assembling and installing it, you need to follow the instructions that are attached to it. Traditionally it is installed either in the top part of the tank or on the side panel. This will provide quick access to the tank if repairs are necessary. It is important to check the correct operation of the pusher pushers, as well as the accuracy of their adjustments.

The most pleasant and responsible moment is checking the work done. This is quite simple: sit on the toilet, tear your legs off the floor. Nothing falls off, there are no springy vibrations? Hence, the installation of the toilet was done correctly. Then drain the water several times and wait for it to refill the tank. There should be no leaks.