Observance of a certain sequence of works during repair is very important. It only seems that the main thing is to start, and already along the way the correct schedule and structure of repair will be built. Certainly, it's not an easy task to decide on holding such an event, but if it is inevitable and the decision is made, everything should be carefully thought out, the progress of the work must be determined in strict sequence and then only proceed. How to start repair?

1. The first thing you need to do is create a design project, decide on the possible re-planning of the premises according to the lifestyle and taste preferences of family members. The pre-compiled project necessarily includes the possible transfer of doors, the installation or dismantling of partitions, the arrangement of switches, sockets and other electrical equipment, the nature of the finishing materials and the color solution of the premises. At this stage, it should be noted that the possible redevelopment will require the processing of documents and obtaining permits, which will take a lot of time.

2. The second point of the preparatory work entitled "Where to start repairing" is the definition of a place for a TV, a split-system, telephone sets and electronic equipment. This will allow you to advance the wiring to them, do the necessary wall shroking at the very first and dirtiest stage of repair.

3. Further, with what to begin repair in an apartment is an electroassembly work: a lining shtrob under hoses and wires, a lining of wires, installation of switches and sockets.

4. At the very first and most rough stage, new window blocks are installed . This work is associated with a lot of dust and dirt, so it is also one of the first, and this is where to start repairing is necessary. After installation, the windows are tightened with film or protected by special paper blinds.

5. After the wiring marked on the design project will be laid in the strobes, the plastering works begin . First, seal all the holes and large cracks, then level the walls with several layers of putty. At this time, also erect various partitions, construct niches, etc. During the plastering work, it is necessary to check the strict verticality of the doorways, in order to quickly and easily install the doors.

6. After the walls proceed to the ceiling. If the ceiling is supposed to be multi-level, construct gypsum plaster structures. Before the usual whitewashing or painting it should also be leveled using putty.

7. Finally, they approach rough work on the floor. If necessary, fill a new screed or cover the floor with sheets of plywood. At this first and dirtiest stage of work is completed.

8. How to start the repair in the next stage? Begin it with the ceiling finish. Painting, whitewashing, finishing of the suspended structure, and also installation of a tension ceiling is the beginning of the second stage.

9. After the completion of work on the ceiling, lay the floor. Here you need to take into account that after installing the screed and before working with floor coverings should take about 30 days. Only ceramic or granite tiles can be glued on the third day after the screed is poured.

10. Before attaching the wallpaper or other wall decoration, install the door frame.

11. Stick wallpaper or decorate the walls with other materials, according to the design project. Finish the repair. Where to start the final stage? The final stage after finishing the walls is the installation of skirting boards, door frames, window corners, screens for radiators.

Adherence to the correct sequence of work will avoid unnecessary labor, save time and building materials, as well as get maximum pleasure from complex and dirty work.