Homeliness, Do it yourself
How to drain the site with your own hands. Construction of a drainage system
The most effective results of how to dry a site with your own hands are achieved only if there is a good street cuvette, a depth of at least 1 m, which will guarantee a spillway. Even on a flat relief, it can significantly suppress the head of groundwater and reduce their level.
If the site tilts to the other side (from the street), then the transverse ditch should be organized along the front side of the fence, longitudinal - to the garden. It must be borne in mind that the beds should be broken across the slope, otherwise nutrients will be washed from the soil.
Before draining a site by the method of gutters, it must be remembered that such measures help only with heavy precipitation and melting snow.
Dehydrating the site with your own hands (if it is level), you should provide along the fence a ditch 2-3 m long, 0.5 m wide and at least 1 m deep. The ground is filled with low-lying places. For a season in a ditch as much as possible densely store building garbage, cans, a fight of glass and other poorly utilized wastes. When the pit is filled to the lowest level of fertile soil, another similar ditch is dug out. The ground, raised from the new ditch, goes to fill the remaining part of the first ditch and to pour the lowlands. So on the perimeter of the site there is a drainage system.
It's easy to answer the question of how to dry a site with your own hands, if it is level and does not have sufficient drainage in a street ditch - it's hard to do. To ensure this, it is necessary to organize a drainage system with a slope of 2-3%. It should consist of separate drains, which are asbestos cement or pottery pipes (diameter 10-15 cm) and a maximum length of 20 meters.
Consider how to drain the site with your own hands, if there is no way to ensure the availability of the necessary pipes. You can use other materials, for example, bricks, from which a tray with a section of 12 x 12 cm, or even a bundle of brushwood without leaves, is laid out. The main thing here is to know the basic information on how to drain the site in the country. After that make the drainage system easy.
It should also be noted that if the site is very much waterlogged, then for its dehumidification use a system supplemented with a water well, where a vibrating pump with automatic control is lowered, ensuring operability in the standby mode and excluding its frequent shutdown.