Project documentation for construction. Examination of project documentation

– это инженерно- и функционально-технологические, архитектурные, конструктивные решения по обеспечению реконструкции или возведения капитальных объектов. Project documentation is engineering and functional-technological, architectural, constructive solutions for providing reconstruction or erection of capital objects. They are provided in the form of materials containing texts, calculations, drawings and graphical schemes. . Let us consider in more detail what the design documentation consists of.

General information

№87 от 2008 г. Перечень капитальных объектов приводится в Приложении к нему. The order, in accordance with which the materials are prepared, is fixed by the Resolution on the composition of sections of project documentation No. 87 dated 2008. The list of capital facilities is given in the Appendix to it. They are divided according to their functional purpose and characteristic features. The following types of objects are indicated in the Appendix:

  1. Industrial buildings, buildings, structures, including those used for security and defense. An exception to this group is linear objects.
  2. Non-production facilities, buildings, housing, housing, communal, socio-cultural buildings.
  3. Linear objects. These include iron / road, pipelines, power lines and so on.

Who prepares the project documentation?

The development of materials on capital objects related to their security can be carried out exclusively by legal entities and entrepreneurs who have obtained permission and certificates of admission to this activity. The necessary securities are issued by the self-regulating organization of the SRO. , выполняются любыми юрлицами или гражданами. Other types of work related to the preparation of project documentation for construction are carried out by any legal entities or citizens.

Basic Parts

In the text block there is information about the capital object, a description of technical and other decisions taken in relation to it, calculations that justify them. . The text part also contains references to normative acts, which were used in the development of project documentation . представлена в виде схем и чертежей, планов, графиков и пр. Правила оформления указанных блоков устанавливаются Минрегионразвития. Graphical part of the project documentation of the house is presented in the form of diagrams and drawings, plans, graphs, etc. The rules for the registration of these blocks are established by the Ministry of Regional Development.

Theses

They are developed and approved if, for the preparation of documentation for the capital object, the safety and reliability requirements are not sufficient or they are not established. The procedure for determining special technical conditions is adopted by the Ministry of Regional Development in coordination with the executive federal structures that implement functions in the field of regulatory legal regulation.

Nuances

The need to determine the requirements for the content of the project documentation blocks, the presence of which is mandatory, is evaluated by agreement between the customer and the development organization. Parts 9, 11, 5, 6 are formed completely for capital facilities that are on budgetary financing (partial including). In other cases, the need to develop these sections, its scope is determined by the customer. The relevant information should be specified in the terms of reference.

Preparation of materials for individual stages of work

The need to develop such documentation is determined by the customer and is specified in the technical task. The possibility of preparing materials for individual stages of work is justified by calculations that confirm the feasibility of implementing the decisions taken in practice. The development is carried out in the amount required for the implementation of the relevant stage. Materials must meet the requirements for the content and composition of sections.

Features of terminology

The construction phase refers to the erection of one of the capital objects, the construction of which is supposed to be conducted on a separate site, if it is possible to autonomously introduce such a building into operation. At the same time, it should be provided for its independent functioning in the future. The construction phase is also called the erection of a part of the capital object, which can also be autonomously put into operation.

GrK

Features of the legal regulation of the preparation, verification and approval of project documentation are disclosed in the Town Planning Code. Particular attention in the study of the issue should be given art. 49. Normally, the examination of project documentation is regulated. This procedure is mandatory, except for the cases listed in parts 2, 3, 3.1 49 of the article of the Code. может быть государственной или негосударственной. Examination of project documentation may be state or non-state. The developer / customer can choose the organization that will perform the audit. является обязательной, то указанные субъекты могут обратиться только в госучреждения. However, if in accordance with the State Committee for State Expertise of project documentation is mandatory, these entities can apply only to state institutions.

Exceptions

For individual capital objects, examination of documentation is not provided for by legislation. For such facilities, certain requirements are set. Objects that are not subject to examination are:

  1. Residential buildings, standing separately and having a height of no more than 3 floors, intended for living 1 family. If permission to erect buildings is issued before 01/01/2016, state supervision is not carried out against them.
  2. Residential buildings, the height of which is not more than three floors, consisting of blocks of no more than 10. In this case, each of them should be intended for living 1 family, have a common wall with no other openings, be located on a separate plot and have access to a common area . Examination is not carried out for such facilities, if they are built not at the expense of budgetary funds.
  3. Multi-apartment buildings, the number of floors in which no more than three, if they were built not on budgetary funds. In this case, they should consist of block-sections (one or several), the number of which is not more than four. Each of them provides for several apartments and common premises, a separate entrance with access to the adjacent territory.
  4. Separately located capital objects with a height of no more than 2 fl., With a total area of up to 1.5 thousand square meters. M, not intended for production and living of people. An exception is provided for structures that are, according to Art. 48.1 GRK, especially dangerous, unique and technically complex.
  5. Separately located capital facilities, whose height does not exceed two floors, with a total area of up to 1.5 thousand square meters. M, used for production purposes, for which no organization of sanitary protection zones is required or they are already installed. An exception is provided for structures classified under Art. 48.1 ГрК, to technically complex, especially dangerous or unique.
  6. Prepared, agreed, approved drilling wells installed in accordance with the technical project for the development of deposits of fossils or other documentation for the implementation of activities related to the use of mineral resources.

Adjustment

после получения положительного заключения. Legislation allows to make changes to the project documentation after receiving a positive conclusion. Confirmation that the adjustments do not concern constructive and other safety characteristics of the capital object is an act of the authority or the competent organization that carried out the audit. When you change the documentation for construction, overhaul, reconstruction of facilities, financing of which is supposed to be financed from the budget, or is provided by legal entities listed in part two of Art. 48.2 GRK, the conclusion also certifies that the modification does not lead to an increase in the estimate. Preparation of this act is carried out within 30 days.

An Important Moment

If changes in the documentation concern constructive or other safety features of the structure or entail an increase in the estimate for construction / reconstruction, the organization or the executive body that carried out the inspection shall refuse to issue an opinion. In such a situation, the materials that have undergone an adjustment must be investigated according to the rules established by the Government in accordance with the SCC.

Additional requirements

Yurlitsa, listed in part 4, 43, 49 of the GRK article, can not perform non-state examination of the documentation, if they have also prepared it. Failure to comply with this requirement entails the cancellation of accreditation. Preparation of expert opinions can be carried out by natural persons, certified in accordance with Art. 49.1, in the direction of "expert", specified in the qualification document. At the same time, these citizens can not participate in the verification if they have an interest in its results, or they or their relatives participated in the development. The relatives, in particular, include parents, adoptive parents, children, siblings, grandparents, spouse, adopted children.