On the stages of repairing walls in the apartment

Ceilings and floor have a small area in the dwellings. This is when compared with the walls in the apartments. It is necessary to periodically repair them. This requires proper attention.

On the importance of repairing walls in a dwelling

There is a vast subject for discussion. It's about repairing the walls in the apartment. As a result of these activities, they must meet different functional conditions. It is said, for example, about the increased humidity in the bathroom, the sudden temperature changes on the balcony and so on.

All of the above listed walls should be transferred to the maximum extent staunchly. It is required that they, as a result of repair work, so to speak, pay back the invested money and time spent. After all, all this is usually done with the use of expensive finishing and other materials, appropriate tools and the like.

In detail about the stages of repairing walls in the apartment

At the first stage of this activity, cleaning is carried out. Actions are being taken to protect the walls from dust by qualified workers who use glasses, respirators, special clothes and gloves. They are carried out by them surface cleaning under the wallpaper, while:

  • Old paint and plaster are removed;
  • Cleaning is carried out by means of an abrasive net manually;
  • Irregularities are found on walls with a depth of more than three millimeters, streaks and so on, if any, then a plaster is produced.

Usually perform a full cleaning. This is done for re-plastering the walls. It is required that they be cleaned before the concrete monolith or brickwork.

Then, drying the walls with a construction hair dryer. Then they are impregnated with a primer, in the composition of which the biocidal components descend. At the next stage, special markers are installed on the walls and the primary plaster is carried out with a mixture on a cement base. Then the crate is produced using various profiles or wood. The necessary cables are laid in it.

At the next stage, the walls are covered with stain, plastic lining, laminate or other. They are also being leveled with a hypocarcone for future finishing or painting. At the final stage of wall sheathing and repair in general, installation of window and door frames is carried out.

There is a recommended option. In order to save money and for aesthetic reasons, you need to perform a wall covering in half the height, as they say. In this case, it is necessary to apply wallpaper or painting to the top. This will allow to improve significantly the lighting of any room as a result of repair. The walls will be reliably protected, which will make it possible not often to update them.

On materials: vopros-remont.ru